Plans for Proposed Local Agency Improvement

90% Drawings

  • Special Provisions
  • Vol 1
    • Part 1 –Title Page, Index of Sheets, General Notes, Construction Items, Typical Sections Roadway Schedule
    • Part 2 — Roadway Schedule (con’t), Alignments Ties and Benchmarks, Key Plan, Roadway Removal Plan, Roadway Plan
    • Part 3 — Roadway Plan (con’t), Roadway Profile, Intersection Grading and Jointing Details, ADA Ramp Details
    • Part 4 — ADA Ramp Details (con’t), Entrance Details, Roadway Details, Building Demolition Key Plan, Suggested Stages of Construction and Traffic Control Schedule, Suggested Stages of Construction and Traffic Control Narrative, Suggested Stages of Construction and Traffic Control Typical Sections
    • Part 5 — Suggested Stages of Construction and Traffic Control Typical Sections (cont’t)
    • Part 6 — Suggested Stages of Construction and Traffic Control Plan, Detour Plan, Brush College Road, Temporary Erosion and Sedimentation Control Plan
    • Part 7 — Temporary Erosion and Sedimentation Control Plan (con’t), Permanent Erosion and Sedimentation Control Plan, Brush College Existing Utility Plan, Faries Parkway Existing Utility Plan
    • Part 8 — Existing Utility Plan, Brush College Road Drainage Schedule, Existing Drainage Removal Plan, Proposed Drainage Plan
    • Part 9 — Proposed Drainage Plan (con’t), Proposed Drainage Profiles Leftside, Proposed Drainage Profiles Rightside
    • Part 10 — Proposed Drainage Profiles Rightside (con’t), Pipe Collar Details, Drainage Details Under Railroads, Temporary Soil Retention System, Drainage Details, Water Main Relocation Plan and Sanitary Sewer Adjustments, Pavement Marking & Signing Schedules
    • Part 11 — Pavement Marking & Signing Plan (con’t), Pavement Marking & Signing – Sign Panels
  • Vol 2
    • Part 1A — Structure No. 058-W003
    • Part 1B — Structure No. 058-W003 (con’t), Structure No. 058-W004
    • Part 2A — Structure No. 058-W-004 (con’t), Structure No. 058-W006, Structure No. 058-W007
    • Part 2B — Structure No. 058-W007 (con’t), Structure No. 058-9202
    • Part 3 — Structure No. 058-W9202 (con’t), Brush College Road & East Faries Parkway, Faries Parkway & JUG Handle Connector Road, Temporary Traffic Signal Plan Details, Proposed Lighting Plan
    • Part 4 — JUG Handle Connector Road Proposed Lighting Plan, Proposed Lighting Plan, Brush College Road
    • Part 5 — Cross Sections
    • Part 6 — Cross Sections (con’t)
    • Part 7 — Cross Sections (con’t)
    • Part 8 — Cross Sections (con’t)
    • Part 9 — Cross Sections (con’t)
    • Part 10 — Cross Sections (con’t)

 

60% Drawings

30% Drawings